A meeting of the shareholders was held in Seward in the morning. Harold updated everybody on what he had heard from Robbie Davidson, and relayed Robbie’s cost estimate ($3K-$4k). It was agreed that we should move forward this year with the driveway, and to hire Robbie to construct it. All stakeholders also submitted and discussed outhouse design ideas. Through a democratic selection process, Nick’s “whimsical” modified A-frame design was selected. Nick, Matt, and Harold took a trip to Spenard Building Supply for materials. Jeanie and Sue took on the project of painting a pair of louvers for the outhouse. By the end of the day, the floor, front, and back panels were framed. The rainbow louvers are a knock-out!