Larry Harmon called from Hope, said he was standing on top of our newly installed culvert! Larry’s driveway is completely done, and he said that the 30’ culvert is not too long. He said ours has a fine-looking layer of D-1 over the culvert and the upper drive. The upper parking slot has not yet been covered with gravel, and apparently there is not yet any gravel added to the hill.
Also, the first birch on the right (which had its roots chopped into a bit during the digging) has toppled in the wind and is blocking the drive. Our security system is in place! We will have to move a small hemlock into that spot and let it grow.
No comments:
Post a Comment