Matt stopped by the Holler on the way down to Seward and checked on the driveway progress. It’s still looking pretty rough. It looks like Robbie spent several hours with the clean-up bucket, and has done the final scrape down the drive, piled that muck down on top of where the first hole was dug. He has moved most of the gravel from the first dig onto the lower part of the drive, filling in the depression just before the parking area and creating a roadbed up around the corner. The excavator is setting there at the corner.
Progress |
No comments:
Post a Comment